1200-L-toulouse-annonce-un-norme-projet-18-millions-d-euros.jpg


Since his return to the elite in the summer of 2022, Toulouse has succeeded has found good stability and is now one of the safe values โ€‹โ€‹of the French Ligue 1 championship. This Wednesday, the club based in Haute-Garonne made a huge announcement with the revival of a project at 18 million euros. This project? The resumption of work in the performance center.

Redbird's investment in the performance center project at 18 million euros confirms its commitment to providing the Toulouse FC with world -class infrastructure, up to the club's sports ambitions. The new performance center will include cutting -edge installations spread over five levels, including a hypoxic chamber, an advanced hydrotherapy and recovery complex, as well as specialized spaces for training and rehabilitation. The Toulouse FC women's team will also benefit from these installations, with dedicated spaces, going beyond the initial perimeter of the project“Can we read in the press release.

The work in the performance center will resume!

This decision to invest in the performance center illustrates Redbird's continuous commitment to Toulouse FC, its supporters and the entire Toulouse community. She also testifies to respect for her promise to provide the infrastructure club up to her sports ambitions“Is it written there.

The new performance center, “Located in the heart of the island of Ramier, will extend on five levels” et “Will be equipped with numerous installations intended to optimize the performance of athletes, including a hypoxic chamber to strengthen the endurance and resistance of players by simulating an environment poor in oxygen, a latest generation hydrotherapy and recovery complex, as well as specialized training and rehabilitation spaces.

A strong signal sent by Redbird!

A project estimated at 18 million euros, and which “is worn by the Renomone KSS design and architecture firm, recognized for its expertise in the design of sports infrastructure“. KSS “In particular designed the Liverpool FC training centers, Tottenham FC, Crystal Palace FC, as the Stade de la Royale Union Saint-Gilloise in Belgium“. Kardham, a leading French real estate group, will assure”The role of chief architect, with the support of LP Promotion, real estate developer and long -standing partner of the club, in charge of project management.

The work “will resume as soon as the conditions allow for companies in charge of the site, which is planned by the end of the summer. The delivery of the project is expected for the end of 2026“. A great joy for Neil Chugani, the interim president.

The resumption of the work of our performance center marks a turning point for the club and underlines the constant commitment of Redbird towards the TFC. This project will bring us the stability necessary to plan our future sporting success, by providing us with infrastructure to make them happen. This world class complex will benefit all our players, women and men, and will embody both our ambition and our attachment to the city“. What probably put an end to the rumors of sales.